Realization of the PB-KU-H production platform – capacity 100,000 bbld oil and 90 MMscfd gas
Power generation barge complete of a steel hull (95 m L x 16 m W x 5 m H) equipped with a total 4 X 30 MWe jet derivative turbo generators, no. 3 diesel generators 2 MW, dedicated auxiliaries and topsides facilities
EPC for a new gas treatment plant to fractionate raw gas coming from the Nawara gas field (in the southern Tunisian desert) into methane...
EPC for a Condensate stabilization plant 4,500 m3/d to secure availability of gas in case the existing Saih Rawl Condensate Process Plant is out of operation including gas compression
EPC for the revamping and upgrading of the existing LPG train including optional engineering studies (FEED dossier) for the optimisation of the LPG vaporisation system, diagnostic of LPG export pumps and bunkerisation of control room
Realization of pumping station SP1 including tie-in/interface with pipelines LR1, ELR1 and injections coming from Z.C.I.N.A. and C.I.N.A.. Fuel gas flowline (4”, 13 km) from GR1 to SP1; Overhead lines 30 kV, 30 MVA from PDE n.04 to SP1 ELR1; Electrical sub-station; Paved road connecting SP1 to RN3
Extension of the existing jetty in the Taranto refinery from Platform P2 to a new Platform P3 for a length of 500 m.
New potassium nitrate plant suitable for a production capacity of 48.000 kg/hr. The plant includes following units: dissolution of raw nitrate salts, conversion of the raw KCl, crystallization of potassium nitrate with all relevant utilities
Power Generation Plant with 50 MW Two Gas turbine driven generators, step up transformers and new 22 kV HV switchgear and associated facilities...
New power plant 50 MW, with the possibility to be upgraded to 100 MW in the future. Purpose of the new power plant is to increase the reliability of electrical feeder of existing KAZ NGL/LPG plant.
realization of a new power generation plant open cycle aimed at providing 320 MW electrical power to the ENI Oil & Gas plants. The plant includes 2 gas turbine generators 166 MW each
New compressor station installed upstream of the existing Central Processing Plant to prevent reduced reservoir pressure.
Block 404 Bir Berkine/ Bir Berkine Nord oil fields development. Including crude oil and gas processing facilities, oil (25,000 BOPD), gas (2.4 MMNm3/d), infrastructure requirements
Treatment plant for the dehydration of gas to reach the required water dew point.