Tempa Rossa jetty

project-09
ENI SpA
Italy, Taranto

Description: Extension of the existing jetty in the Taranto refinery from Platform P2 to a new Platform P3 for a length of 500 m. Installation of all facilities for the reception and the transfer of the oil from the Tempa Rossa Oil Center. The new P3 Platform will be fitted on the East Direction in order to guarantee the mooring of the ships with a minimum capacity of 30.000 DWT to a maximum capacity of 80.000 DWT.
Duration: 2012 ÷ 2018
Scope of Work: Engineering, Procurement, Construction