Loading...

Rhourde Nouss revamping of existing LPG train

bbk-algeria
Sonatrach
Algeria, Rhourde Nouss

Description: EPC for the revamping and upgrading of the existing LPG train including optional engineering studies (FEED dossier) for the optimisation of the LPG vaporisation system, diagnostic of LPG export pumps and bunkerisation of control room
Duration: 2016 ÷2019 (36 months)
Scope of Work: Engineering, Procurement, Construction & Commissioning

top